Frontmatter
| id | 19172 |
| title | DateSelector throws when weekStartDay changes during a month slide |
| state | Closed |
| labels | bugai |
| assignees | sloemo01 |
| createdAt | Sep 24, 2026, 5:01 PM |
| updatedAt | Oct 7, 2026, 2:27 PM |
| githubUrl | https://github.com/neomjs/neo/issues/19172 |
| author | neo-opus-grace |
| commentsCount | 3 |
| parentIssue | null |
| subIssues | [] |
| subIssuesCompleted | 0 |
| subIssuesTotal | 0 |
| contentTrust | |
| projected | |
| quarantined | 0 |
| signals | [] |
| blockedBy | [] |
| blocking | [] |
| closedAt | Oct 7, 2026, 2:27 PM |
DateSelector throws when weekStartDay changes during a month slide

Claiming this one, following up on #19171.
Plan: a component arm in the calendar-month fixture that moves currentDate to August and then weekStartDay back to back, the order that crashes today, red before the fix with the worker-error gate catching the transform error. Then the fix chosen from what that arm shows: either the day-view rebuild defers while isUpdating is set, or changeMonthTransitionCallback re-resolves its wrapper and stands down when it is gone. AC3 included: #19171's weekend arm loses its ordering workaround and its comment points here.
Everything the ticket asks for is verifiable locally, the component tier runs from the checkout alone.

The red arm is up and reproduces the ticket exactly, and the fix is in on fix/19172-dateselector-weekstartday-mid-slide.
The red arm. test/playwright/component/calendar/DateSelectorWeekStartDayMidSlide.spec.mjs drives the calendar-month fixture twice (setCurrentDate, then setWeekStartDay, two separate driver imports because the first write has to start the sidebar's slide before the second lands). Before the fix:
pageerror: Cannot set properties of undefined (setting 'transform')
at DateSelector.changeMonthTransitionCallback (src/component/DateSelector.mjs:525:45)
That is the crash the ticket reported, verbatim, on the pair of writes the ticket names.
The mechanism, confirmed by the arm rather than by reading. changeMonth parks the month content in an animation wrapper at vdom.cn[1] and starts the slide; changeMonthTransitionCallback then writes vdom.cn[1].cn[0].style.transform. The day-view rebuild that afterSetWeekStartDay runs wipes that same wrapper's children (getCenterContentEl().cn = []), so the callback's read lands one level down on a node with no style. The inference in the ticket holds.
The fix. recreateDayViewContent now caches its arguments and defers while isUpdating is set, the window where the transition owns the center element; afterSetIsUpdating(false) replays it. The slide's own callbacks keep their wrapper, and the rebuild lands after the transition settles. This is the first of the two shapes the ticket sketched (defer the rebuild until isUpdating clears); the second is unnecessary once the first is in place.
On the same branch: DateSelectorWeekStartDayMidSlide green, and AC-3 done, arm 4 of MonthGridStructure.spec.mjs loses its ordering comment and now notes that either write order is safe ([#19172]).

The branch is up as #19447 (targeting dev). Red arm, fix and AC-3 are on it; CI is running. The one deviation from the comment above: the arm drives the pair as two separate driver imports, because a single import writing both values never enters the race window and passes on unfixed code.
Context
#19171's weekend arm moves
weekStartDayfirst and the month second, and it waits for the sidebar's day names in between. Its comment explains why: run the other way round, the pair crashed. The PR works around the crash; this issue reports it.Reproduced on #19171's head
f42ce1f9b3, which changes no file undersrc/:calendar-monthcomponent fixture.currentDatefrom February to August 2027.weekStartDay: 1.The page throws
Cannot set properties of undefined (setting 'transform'), and the fixtures' worker-error gate fails the test. The month grid itself ends correct, with row 6 starting on2027-07-26. Only the sidebarDateSelectorthrows.The Problem
A user who changes the week's first day in the calendar settings while the sidebar is still sliding to another month gets an uncaught error. The same applies to any code that moves both values back to back.
The Architectural Reality
DateSelector#changeMonth(src/component/DateSelector.mjs:461) starts a slide by wrapping the day view in an animation wrapper.changeMonthTransitionCallback(:520-525) later writesme.vdom.cn[1].cn[0].style.transform.afterSetWeekStartDay(:397-399) callsrecreateDayViewContent(false, false), which rebuilds the day view in place.The likely mechanism is an inference, still to be confirmed by the red arm below: the rebuild lands while the slide is in flight, so the callback reads a node that is no longer the wrapper and has no
style.The Fix
A config change during a month transition must not read or reshape the transition's vdom. Two plausible shapes:
isUpdatingclears;Choose from the red arm, not from this sketch.
Acceptance Criteria
weekStartDayback to back is red before the fix: the page error above.2027-07-26, and the sidebar's day names start with Monday.Related
#19171 · #19006 · #19149 (the same contributor's previous finding)
Sweeps at 15:00Z:
DateSelector transform,changeMonthTransitionCallback,DateSelector weekStartDay): only #175, closed and unrelated.Retrieval Hint: "DateSelector weekStartDay month slide transform crash changeMonthTransitionCallback"
Origin Session ID: 1f7129c9-c0f7-42e0-ba47-7a42e5ac57c2