LearnNewsExamplesServices
Frontmatter
id19099
titleSurvey components, grid and theming since 13.1 for the 13.2 notes
stateClosed
labels
documentationenhancementai
assigneesneo-opus-grace
createdAtSep 23, 2026, 11:26 AM
updatedAtSep 24, 2026, 6:42 PM
githubUrlhttps://github.com/neomjs/neo/issues/19099
authorneo-opus-grace
commentsCount4
parentIssue14800
subIssues[]
subIssuesCompleted0
subIssuesTotal0
contentTrust
projected
quarantined0
signals[]
blockedBy[x] 19120 Tell the 13.2 Engine story through reader outcomes
blocking[]
closedAtSep 24, 2026, 6:42 PM
milestonev13.2

Survey components, grid and theming since 13.1 for the 13.2 notes

Closed v13.2.0/archive-v13-2-0-chunk-22 documentationenhancementai
neo-opus-grace
neo-opus-grace commented on Sep 23, 2026, 11:26 AM

Context

This is a survey leaf of #14800. It follows the survey method (@tobiu, 2026-09-23: the window is roughly 1,500 PRs and the split moved the Brain and the Fleet Manager out of scope).

This leaf covers components, grid and theming: 187 merged PRs, listed in the first comment. It holds PRs scoped grid, form, component, tab, menu, draggable, theme, … and, for PRs whose title names no scope, those touching the other src/* folders or resources/scss/.

The Problem

Components and themes are what a user sees first. Grid cell editing already has a chapter (#18762, deposited 2026-09-19). The rest of the slice is unread, and the notes cannot yet tell a reader which components changed, gained features, or look different.

The Architectural Reality

The population rule and the Tier 1–3 rubric are in the method comment.

The Fix

Read the slice, then fold its reader-relevant items into resources/content/release-notes/v13.2.0.md as reader prose, inside the structure #19120 set. Cell editing keeps its chapter and is not repeated. The survey itself (counts, exclusions, nominations) stays out of the public notes.

Acceptance Criteria

  • AC-1 Every PR in the slice is read. The counts (read, listed, excluded, with reasons) are posted as a comment on this ticket, and the notes carry no counts line. (Re-pointed 2026-09-24: the items ship in #19121, vehicle B, so no PR of this ticket carries a body.)
  • AC-2 Each Tier 1–3 item reaches the notes as reader prose, through #19120 → PR #19121: what a reader can now do or must now know, with its PR or ticket. The notes carry no survey ledger.
  • AC-3 At most two chapter nominations, each with evidence and its mining state, posted on #14800 rather than in the notes.
  • AC-4 Reviewed cross-family.

Updated 2026-09-23: after the operator's register ruling on the merged notes (#19120), the counts and nominations move out of the public notes.

Out of Scope

  • Tier-2 items beyond noting them: the upgrade-path leaf owns them.
  • Dock Layouts, which has its own leaf.

Related

#14800 · PR #19091 · #18762

unowned-rationale: open for any maintainer. Claim it by self-assigning; it was announced to all agents with its siblings.


Live latest-open sweep: the latest 20 open issues at 2026-09-23T09:26:41Z; no survey leaf exists. A2A claim sweep: the newest messages, all read-states; no claim on a 13.2 notes survey. MC sweep: "release notes which items matter to external readers since last release" found the v13.1 precedent (selection over enumeration, a curated digest, an actionability section) and no prior decision against surveys. Own-assignment sweep: #14800 (parent) and #19090 (iteration 1); no overlap.

Origin Session ID: bf94c4a1-fded-4546-87d6-73df33928275 Retrieval Hint: "13.2 release notes survey external readers components grid theming"